DONALD W. REYNOLDS RAZORBACK STADIUM EXPANSION

This $160 million project added luxury suites, loge boxes, club seating, and a game-day locker to the eighty-year-old stadium. TCM Enterprises served as the framing, drywall, and acoustical ceiling subcontractor for the CDI/Hunt Construction joint venture. During this project, we provided and installed more than 700,000 pounds of metal studs, over 1,000,000 square feet of gypsum wallboard, and eighteen different types of acoustical ceiling systems. All of the interior spaces in this expansion will be premium, high-end spaces, designed to provide an unmatched game-day experience for Razorback fans.

» Location: Fayetteville, Arkansas

» General Contractor: CDI/Hunt Joint Venture

» Architect: Polk Stanley Wilcox Architects/Populous

Let’s Discuss your next project »